This assignment requires the use of MS Project or similar software. If you do not have MS Project or similarsoftware, you may look for free or trial versions on the Internet.
Part 1: Develop an in-depth schedule for your initial project based on the Work Breakdown Structure you completed in Unit III. Please refer to the Integrated Project
Be sure to include:
1. An activity precedence diagram
2. An activity duration table
3. A network diagram and Gantt charts
Part 2: Please complete Case Study 10.2, “Project Scheduling at Blanque Check Construction”
Respond to the questions for discussion. Please make sure that each question is answered thoroughly using a minimum of 200 words for each case study question.Add reference.
Part 3: Develop the network activity chart and identify the critical path for a project based on the information provided in the Gantt Chart Activity document.
1. Draw the activity network as a Gantt chart.
2. What is the expected duration of the project?
Part 4: Consider the project with the information provided in the Project Activity Network document.
1. Construct the project activity network using AON methodology and label each node.
2. Identify the critical path and other paths through the network.